DEMOLITION POWER DISCONNECTION

DEMOLITION POWER DISCONNECTION

Level 2 ASP · Demolition & Construction

Before a house or building can be demolished in Sydney, the electricity supply must be safely disconnected at the network — switching off the main switch is not enough. Sydney Power Group is an accredited Level 2 ASP authorised to physically disconnect and remove the service on both the Ausgrid and Endeavour Energy networks. We handle the disconnection, meter removal, service removal and the distributor paperwork, then confirm the site is electrically clear so your demolition contractor can start on schedule.

Why the Main Switch Isn't Enough

Turning the power off at the switchboard only isolates the wiring inside the building — the service line from the street, the point of attachment and the meter all remain live at network voltage. Excavators and demolition crews working around a live service risk serious injury and network damage. That's why demolition contractors require the supply to be physically disconnected and removed by an authorised Level 2 ASP before machines arrive on site.

Live switchboard before demolition power disconnection Sydney

Overhead & Underground Disconnections

For overhead-supplied properties we disconnect at the network pole, remove the overhead service mains and the point of attachment from the structure, and remove any private power pole that's coming down with the site. For underground-supplied properties we isolate and disconnect at the pillar or pit and make the underground service safe so excavation can proceed. We confirm your supply arrangement during quoting so there are no surprises on the day.

Underground power disconnection before demolition Sydney

Temporary vs Permanent Disconnection

If the site will be rebuilt — a knock-down rebuild or new development — a disconnection that preserves the ability to reconnect is usually the right call, often paired with temporary builders power for the construction phase. If the supply is never coming back, a permanent supply abolishment is required instead. We'll recommend the right option based on your project so you don't pay for works you don't need.

Temporary versus permanent power disconnection for demolition

Paperwork, Scheduling & Demolition Clearance

A demolition disconnection involves your electricity retailer (to close or hold the account and arrange meter removal) and the network distributor (to approve the physical disconnection). We coordinate both, schedule the work to suit your demolition date, and provide written confirmation the site is electrically disconnected — the document your demolisher and certifier will ask for. To quote we typically need the site address, a photo of the meter box and the front of the property, and your target demolition date. Call 0466 125 125 or use our contact page.

Level 2 ASP providing demolition electrical clearance Sydney
DEMOLITION POWER DISCONNECTION
Free Assessment

Call us now for a no-obligation quote. Emergency response available 24/7 — on-site within 60 minutes across Sydney.

0466 125 125Get a Free Quote

What We Cover

  • Overhead & Underground Disconnections
  • Meter & Service Mains Removal
  • Distributor Paperwork Handled
  • Demolition Contractor Coordination
  • Written Clearance For Your Demolisher
Accredited & Licensed
ASP Authorisation No. 5334
Contractor Licence 318221C
$20 million public liability insurance
ASP Accredited
ASP Authorisation No. 5334
Licensed Electricians
Contractor Licence 318221C
Fully Insured
$20M public liability + workers comp
Australian Owned
Sydney based & operated
Emergency 24/7
On-site within 60 minutes
15 Years in Business
Level 2 network specialists

What Sydney Says About Us

Don't take our word for it — read genuine reviews from real customers who booked our demolition power disconnection service on our Google profile, or leave one after your job is done.

Read Our Google Reviews

Recent Work

Overhead service disconnection before demolition
Overhead service disconnection
Underground service made safe for demolition
Underground service made safe
Meter removed before demolition
Meter removal coordinated
Demolition site electrically cleared
Site cleared for demolition

READY TO GET CONNECTED?

Free assessment on any network electrical job. Emergency? We answer around the clock.