Solar panels only tell half the story. To be credited for the power you send back to the grid, your home needs a meter that measures energy flowing *both* ways — and that meter upgrade is network-side work carried out by a Level 2 ASP. If you're planning a solar system in Sydney, understanding the metering side up front saves surprises when the first bill lands.
Why Solar Needs a Special Meter
A standard accumulation meter only counts power coming *into* your home. Once you have solar, energy also flows *out* to the grid whenever your panels produce more than you're using. To capture both directions you need a bi-directional (import/export) smart meter.
Without the right meter, exported solar simply isn't recorded — meaning no feed-in credit for power you're generating. That's why arranging the metering upgrade is a core part of any solar installation, not an afterthought.
Feed-in Tariffs and How Credits Work
Your retailer pays a feed-in tariff for each kilowatt-hour you export. The bi-directional meter records your import and export separately, and your bill nets them off. Using solar power the moment it's generated (self-consumption) is usually worth more than exporting it, so running big loads during daylight hours maximises the benefit.
Feed-in rates vary between retailers and change over time, so it's worth comparing plans once your solar is live. The metering just needs to be accurate and correctly configured for the credits to flow.
Who Can Install and Upgrade the Meter
Here's the part many homeowners miss: your solar installer wires the panels and inverter on your side of the meter, but the meter itself sits on the network side. Swapping to a bi-directional smart meter and coordinating the connection with Ausgrid, Endeavour Energy, or Essential Energy legally requires a Level 2 ASP.
Sydney Power Group handles the metering and network connection side of solar so it dovetails cleanly with your installer's work — no gaps, no finger-pointing, and no delay in earning feed-in credits.
Getting the Timing Right
Ideally the meter upgrade is booked to line up with the panel installation and inverter commissioning so your system starts crediting exports straight away. Leaving the meter change until later means generating solar you don't get paid for.
Planning a solar install and want the metering handled properly from day one? Call 0466 125 125 or book a free on-site quote and we'll coordinate the Level 2 side for you.

Call us now for a no-obligation quote. Emergency response available 24/7.
0466 125 125Get a Free QuoteRelated Services
Free Tools
NEED A LEVEL 2 ASP ELECTRICIAN?
Free assessment on any network electrical job. Emergency? We answer around the clock.